Resources / Checklists
Solar & Heat Pump Planning Checklist
Sequencing, electrics, self-use and grants — for homeowners in Devon & Cornwall deciding what order to do things in.
Independent planning tool from HeatWiseSW — not a payback guarantee.
How to use: Be honest about urgency of heat vs roof opportunity. Solar does not make midwinter heating free. Tick gaps before you sign either quote.
1. Urgency & sequence
- ☐Is heating urgent (failed boiler, leaving oil this winter)? → heat pump path first
- ☐Is scaffold/roof work already booked and heating stable? → solar can go first
- ☐Can we fund a coordinated design this year? → plan both together electrically
- ☐I accept the winter gap: PV is weakest when heat demand peaks
2. Heat pump side (if in scope)
- ☐Heat loss will be done — solar will not replace correct kW sizing
- ☐Emitters / UFH plan at low flow temperature
- ☐BUS eligibility checked (£7,500 / £9,000 oil-LPG off-gas where rules allow)
- ☐Outdoor unit siting & noise assessment considered
3. Roof & solar yield
- ☐Orientation and pitch noted (south / east–west / mixed)
- ☐Shade from trees, chimneys, neighbours photographed
- ☐Conservation / listed visibility constraints checked if relevant
- ☐Roof condition — fixings and remaining life discussed
4. Self-use & money
- ☐Daytime occupancy / flexible loads (appliances, EV, immersion) noted
- ☐Payback assumptions: generation kWh, self-use %, import & export rates in writing
- ☐Battery only if surplus + evening import justify capital (not automatic)
- ☐Scaffold and electrical upgrade costs included in comparisons
5. Electrics (both technologies)
- ☐Main fuse / supply capacity to be confirmed
- ☐Consumer unit space for heat pump ± PV ± EV
- ☐If solar first: headroom left for future heat pump
- ☐If heat pump first: cable routes and isolation planned cleanly
6. Fabric (still counts)
- ☐Easy wins listed (loft, draughts) before oversized plant
- ☐Ventilation considered if tightening the house
7. Decision lock
- ☐Chosen sequence written: fabric / HP / solar / battery order
- ☐One person owns design coordination across trades
- ☐I will not undersize the heat pump because “solar is coming”
Next step
Run planning numbers for both technologies, then lock sequence from urgency and roof reality.
HeatWiseSW — independent advice for Devon & Cornwall. Checklists are educational planning aids.
Next step
Get a realistic planning band for your home, then use the checklist when you speak to installers.