Underfloor Heating Renovation Checklist

For Devon & Cornwall renovations — solid floors, joists, height, disruption and heat source. Use before you order boards or agree a dig-out.

Independent planning tool from HeatWiseSW — not a fixed quote.

How to use: Work room by room if needed. Measure door heights. Photo floor construction where visible. Decide programme before product brand.

1. Construction (per floor / area)

  • Ground floor: solid slab / suspended / mixed / unknown
  • Upper floors: joist direction and deck type known if possible
  • Rooms listed with construction type (do not assume whole house is the same)
  • Existing floor finish and whether it is coming up

2. Height & thresholds

  • Door clearances measured (finished floor to underside of door)
  • Stair nosings / top step checked
  • Kitchen units / fixed joinery constraints noted
  • Level access / threshold requirements considered
  • Maximum build-up you can accept written down (mm)

3. Programme & living in the house

  • Which rooms must stay usable during works?
  • Can you accept screed cure time (often long on traditional pours)?
  • Phasing plan: which zones first?
  • Temporary heating needed?

4. System family (not brand yet)

  • Solid floor + occupied → lean toward overlay unless dig-out planned
  • Floor already open / new slab → screed may win
  • Joisted upstairs → plates / deck overlay / structural boards (not casual wet screed)
  • Insulation below heated plane planned (especially joist voids)

5. Heat source

  • Boiler / heat pump / undecided
  • If heat pump: design output at low flow temperature
  • If boiler: blending at manifold expected
  • Manifold location agreed (length of runs, access, noise)

6. Finishes & output

  • Intended finish per room (tile / timber / vinyl / carpet)
  • Design assumes that finish — thick carpet needs honesty
  • Room heat loss vs floor output discussed for high-glazing rooms

7. Commissioning (do not skip)

  • Manifold balancing to design flows — not “all valves open”
  • Air purged; actuators and thermostats tested
  • Handover: how to run steady temperatures (especially with heat pump)

Next step

Get a planning band by floor type, then survey height properly before ordering.